Hydro-Jet® Screen  
   

  • Overview
  • How it works
  • Performance
  • Enquiries
  • Case Studies
  • Maintenance
  • Animations
  • FAQ
  • Health and Safety
  • Install
  • Drawings
  • Spares and Service
Installation
Installation is offered as an optional extra. In all cases Hydro International provide drawings of the required concrete chamber to house the unit and work with the designers to achieve the optimum design for each location. The stainless steel components are lifted into the chamber where they are assembled according to Hydro's general arrangement and assembly drawings and are bolted into place using the fittings provided.