Hydro-Static® Screen  
   

  • Overview
  • How it works
  • Performance
  • Inquiries
  • Case Studies
  • FAQ
  • FAQ
  • FAQ
  • FAQ
Hydro-Static® Screen
Fields marked * are required.
Client Information
*Contact Name:
*Company:
*Address:
*Town:
*County:
*Postcode:
*Tel:
Fax:
*E-mail:
Date of Enquiry:
 
Project information
*Project Name:
Site Location:
   
Design Criteria  
Effluent Type: (eg. foul, surface, river)
Pass-on Flow at First Spill: l/s(eg. Formula A Flow)
Maximum Expected Spill Flow: l/s
Return Period 1 in: years
 
What is the maximum top water level in the main discharge pipeline / channel / watercourse / storm tank?
   
Maximum Top Water Level: m
   
Standard:  


Other Comments
Please enter any additional comments or design considerations:

Please check that all information is correct, then... for free design service.