Stormbloc® Infiltration System  
   

  • Overview
  • How it works
  • Performance
  • Inquiries
  • Case Studies
  • maintenance
  • FAQ
  • Drawings
  • Installation
  • Health and Safety
How it Works
The blocks are installed with each inspection tunnel aligned to give access throughout the complete soakaway or infiltration system. Using the connector plates (as supplied) at each end of the tunnels allows multiple connections to be made, if required, for incoming pipework, inspection access or venting.

Stormbloc® is considerably less prone to siltation or blockage than other systems due to the clear flow path through the system and can be periodically inspected or even flushed out / cleaned if necessary.