Swirl-Flo® Process  
 

  • Overview
  • How it works
  • Performance
  • Inquiries
  • Case Studies
  • maintenance
  • FAQ
  • Health
  • Install

Swirl-Flo® Case Studies
In 2000 two 16 metre diameter Swirl-FloŽ Separators were installed at Kinnegar STW in Belfast. These are the largest SwirlFloŽ Separators installed to date and were used in place of two traditional circular primary settlement tanks which would each have been 32 metre diameter. As such they were designed to achieve the same performance in only 25% of the cross-sectional area... Read more...