|
|
Installation Instructions
Typical installation procedures include:
- Excavation of the detention/infiltration volume
- Laying a geotextile (for infiltration) or a membrane (for detention)
- Installing the Stormbloc™ blocks, Stormbloc™ Inspect Chambers, end plates, and connecting inlet/outlet pipework
- Wrapping the geotextile or sealing the membrane around the finished Stormbloc™ volume
- Backfilling the sides and top of the system
Please call or inquire online for a detailed installation manual or Click here to download user manual.
Play the video below to see a Stormbloc™ system being installed
|