|
|
Installation Instructions
Typical installation procedures include:
- Excavation of the detention/infiltration volume
- Laying a geotextile (for infiltration) or a membrane (for detention)
- Installing the Stormbloc® blocks, Stormbloc® Inspect Chambers, end plates, and connecting inlet/outlet pipework
- Wrapping the geotextile or sealing the membrane around the finished Stormbloc® volume
- Backfilling the sides and top of the system
|