Grit King® Process Inquiry  
   

  • Overview
  • How it works
  • Performance
  • Performance
  • Performance
  • Inquiries
  • Case Studies
  • Animations
  • FAQ
  • Download Operation & Maintenance Manuals, Specs and Drawings
Grit King® Process Inquiry
Fields marked * are required.
Client Information
*Contact Name:
*Company:
*Address:
*City:
*State:
*Zipcode:
*Tel:
*Fax:
*E-mail:
Date of Inquiry:
 
Project information
*Project Name:
*Project Location:
   
Design Criteria  
*Peak Design Flow: MGD
Average Daily Flow: MGD
Dry Weather Flow (DWF): MGD
   
Project Information  
New
Existing
Inlet: Gravity
Pumped
 
*Equipment Type  
Below ground concrete chamber
Above ground concrete chamber
Free standing stainless steel
 
Available Headloss:

   
Removal Requirements  
95% down to microns at peak flow. (Typically removal of 95% of all grit particles with a specific gravity of 2.65 down to 150 microns at peak design flow) .
   
Optional Extras Available  
 
Control Panel
NEMA 4X
NEMA 7
NEMA 12
 
Grit Pump
Submersible
Dry Mount
 
Grit Classifier
Decanter
Grit Container
   
Is this Inquiry for:  
Study/Planning
Initial Design Stage
Bidding Stage
 
AdditionalComments
Please enter any additional comments or design considerations:
 

Please check that all information is correct, then... for free design service.